Heavy scale deposits were forming in pump bleed pipes, a critical point in the process
To limit scale, Alier was dosing 3,000 kg of CO₂ daily (over three tonnes)
Despite this, pump breakdowns still occurred
Ongoing costs included purchasing and handling CO₂, unplanned downtime, and maintenance labour
CO₂ dosing was gradually reduced and completely eliminated within three weeks
Years later, inspections confirmed no scale formation in pump bleed pipes
No breakdowns occurred, improving uptime and reliability of the pulp drying process
Cost savings from eliminating CO₂ dosing alone gave a payback period of less than five months
Additional benefits included avoided maintenance costs, uninterrupted production, and reduced environmental impact from no longer venting CO₂ to the atmosphere
Reducing downtime on offshore compressor cooling systems

Reducing downtime on offshore compressor cooling systems

Achieving 12 months of scale-free performance in hard-water conditions

Achieving 12 months of scale-free performance in hard-water conditions

Eliminating limescale in a coastal hospitality water system

Eliminating limescale in a coastal hospitality water system

Restoring HVAC performance in a large education facility

Restoring HVAC performance in a large education facility

Preventing scale in building services systems

Preventing scale in building services systems

Eliminating scale and chemical cleaning in a commercial training kitchen

Eliminating scale and chemical cleaning in a commercial training kitchen

Reducing maintenance downtime in a busy restaurant

Reducing maintenance downtime in a busy restaurant

Improving cooling efficiency in industrial plastics manufacturing

Improving cooling efficiency in industrial plastics manufacturing

Protecting cooling circuits at a tile manufacturer

Protecting cooling circuits at a tile manufacturer

Improving cooling efficiency at a Honda manufacturing plant

Improving cooling efficiency at a Honda manufacturing plant